Brad Coons with LeVan Excavating Inc. operates a track hoe today as a two-month water main project on outh Main Street gets under way. The $511,000 project will replace two aging water lines — a six-inch main and an eight-inch main — with a 12-inch main. Traffic will be reduced to single lanes north and south during work. (EXAMINER PHOTO | JOEL E. MAST)